List of Plant & Machinery :

  1. Drum Mix Plant 1 No.
  2. Wet Mix Plant Apollo 100 TPH. 1 No.
  3. Stone Crusher 100 TPH 1 No.
  4. Motor Grader - 1 No.
  5. Sensor Pavers 2 No.
  6. Mechanical Paver 1 No.
  7. Vibratory rollers 2 Nos.
  8. Soil Compactors 1 No.
  9. Static rollers 3 Nos.
  10. TATA HITACHI excavators Ex-200-2Nos.
  11. TATA HITACHI excavators Ex-60-1Nos.
  12. JCB machines 5 Nos.
  13. Tippers/Dumpers/Water Tankers-2 Nos.
  14. Asphalt Bowzers-4 Nos.
  15. Tractors 3 Nos.
  16. Laboratory to Conduct all necessary tests requiresd for earthwork & asphalting work.
  17. Including design mix.
  18. Concrete mixers 3 Nos.

Turnover of the Company :
The annual turnover of the entire group as well as that of the construction company for the past three years is as under (Rs in Lacks)

Name Of COMPANY 2003-04 2004-05 2005-06 2006-07
P. M. chordia Engineers & Contractors. 748.73 676.03 411.74 1100.00
P. M. Chordia Petroleum ---- 850.09 891.40 1255.00
P. M. Chordia Foods & Bevrages Pvt. Ltd. 101.08 138.75 166.22 232.25
         

Information Regarding Completed Projects :-
  1. Construction work of Nagpur- Mumbai express highway, Package XIIfrom Aurangabad to Latur --- 30 Km.
  2. Asphalting of major roads in MIDC Waluj near Aurangabad for a total road length of about 26 Km.
  3. Asphalting of National Highway No. 211 Aurangabad to Sholapur, for length of 10 Km.
  4. Construction of Irrigation Tank at Bhutwada, Dist Ahmadnagar Under Krishna Basin Corporation.
  5. Protection to chota Tawa Major Bridge and Construction of RUBs three NOs for central Railways Khandwa.
 